If work must occur near overhead power lines, request that the utility company de-energize them beforehand.
Why It Matters:
Live power lines pose a constant threat. De-energizing eliminates the risk of arc flash, electrocution, or fatal contact during lifting operations.
Key Points:
- Always coordinate with the utility provider well in advance of scheduled work.
- Submit a formal request for de-energization and obtain written confirmation.
- Post warning signs or barricades until confirmation is received.
- Continue to treat all lines as energized unless confirmed otherwise — even if they appear inactive.
- Ensure all workers are briefed on the power line status during the pre-lift meeting.
✅ De-energize to minimize risk.
Ask the Crew:
- Have we contacted the utility provider?
- Do we have written confirmation before starting work?
- Is everyone clear on which lines are energized vs. de-energized?