A poorly placed spoil pile can trigger the very cave-in you’re trying to prevent.
Improper placement of excavated material (spoil) increases pressure on trench walls and can lead to collapse. These toolbox talks cover OSHA spoil pile distance requirements, sloped surface considerations, drainage control, and best practices for staging excavated materials on active sites. Use them to ensure crews understand how to manage soil safely and protect trench integrity.
Reinforce excavation safety meetings with toolbox talks focused on spoil pile placement, OSHA 1926.651 guidelines, and trench stability practices that prevent collapses.